Street Division

The Department of Public Works Street Division is responsible for the maintenance of streets, right-of-ways, municipal buildings, urban forestry and landscape sites, traffic control signs, street lighting, storm sewer and detention systems.  During the winter season the Street Division conducts snow and ice control operations on the Village’s 243 lane miles of roads including 328 cul-de-sacs and dead end streets.

Sidewalk / Curb Maintenance

Apr 26, 2017, 14:04 PM

Public Works conducts repair and replacement of the Village’s sidewalks and curb sections that are designated as unsafe or hazardous situations. Large or numerous cracks, settlements, heaved or displaced sections, and areas that hold water for more than 48 hours after a rainfall are typical conditions that may trigger a repair.

Learn more about Public Sidewalk Ponding.

Learn more about Public Sidewalk Settlement Trip Hazards.