Street Division

The Department of Public Works Street Division is responsible for the maintenance of streets, right-of-ways, municipal buildings, urban forestry and landscape sites, traffic control signs, street lighting, storm sewer and detention systems.  During the winter season the Street Division conducts snow and ice control operations on the Village’s 243 lane miles of roads including 328 cul-de-sacs and dead end streets.

Roadway Maintenance

Apr 26, 2017, 14:03 PM
Public Works performs emergency asphalt and concrete repairs to Village roadways when small or isolated pavement failures occur. The freeze-thaw cycles in northern Illinois can cause potholes, cracking and heaving that if addressed early can prolong the service life of the pavement. Large failures will be referred to the Engineering Division for inclusion in their MFT pavement patching program.